Below ground asbestos found on site

An initial asbestos report on above ground infrastructure was completed in 2024 and no asbestos was found on site at that time. However, during the demolition works in late February, below ground asbestos was discovered. The recently discovered asbestos is in the form of a 50m+ asbestos pipe, is non-friable (Class B), meaning it is in a stable form and poses minimal risk unless disturbed.

The asbestos is being handled by a Class B licensed asbestos removalist, in full compliance with the Health and Safety at Work (Asbestos) Regulations 2016. The asbestos has been securely contained on-site, and all necessary precautions are being taken to ensure the safety of workers and the public.

The discovery has temporarily paused work in the immediate area where the asbestos was found, but demolition work is continuing in other parts of the site. While this discovery may cause a slight delay in the project timeline, we are working to manage the situation efficiently and minimise any impact. At this stage we do not anticipate extending the project timeline.

Since the asbestos is undisturbed and has not been exposed to conditions that could release fibres into the air (such as construction activities), soil testing may not be required immediately. Regular monitoring and assessment will continue throughout the project to ensure that the asbestos remains undisturbed. If any changes occur in the condition of the site that could lead to the disturbance of asbestos, immediate action will be taken, which may include soil testing, air monitoring, or further containment efforts.

We'll provide updates if anything changes.

Share Below ground asbestos found on site on Facebook Share Below ground asbestos found on site on Twitter Share Below ground asbestos found on site on Linkedin Email Below ground asbestos found on site link
#<Object:0x000000002ee8b6a0>